How to adjust the starting budget of a Stakeholder: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 8: | Line 8: | ||
|Click on Stakeholders. | |Click on Stakeholders. | ||
|Click on the desired Stakeholder in the left-sided bar. | |Click on the desired Stakeholder in the left-sided bar. | ||
|Adjust the Start Budget on the right side to the desired amount. | |Adjust the Start Budget on the right side of the platform to the desired amount. | ||
}} | }} | ||
Revision as of 09:45, 23 September 2020
The budget a stakeholder has during a session can be adjusted for each level via the Stakeholder ribbon. When clicking on a stakeholder, the start budget is visible in the right bar of the Tygron Platform. By default, the start budget of a stakeholder is '0', although this can be adjusted to a desired amount. It is also possible by selecting a level in the stakeholder menu to use an Additional Budget in the same bar on the right side. This additional budget will be added up by the Start Budget at the beginning of a level.
How to adjust the starting budget:
- Click on Stakeholders.
- Click on the desired Stakeholder in the left-sided bar.
- Adjust the Start Budget on the right side of the platform to the desired amount.