Oxidation formula (Subsidence Overlay): Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 1: | Line 1: | ||
The amount of subsidence due to oxidation is calculated by the following formula: | The amount of subsidence due to oxidation is calculated by the following formula: | ||
<math>S_O = d_{gw,y} | <math>S_O = d_{gw,y} \cdot a_{y} - d_{ct} \cdot b - c</math> | ||
where | where |
Revision as of 13:38, 9 February 2021
The amount of subsidence due to oxidation is calculated by the following formula:
where
- is the subsidence due to oxidation.
- is the calculated ground water depth for year y.
- is the calculated a parameter value for the current year .
- is the clay thickness of the terrain, defined by CLAY_THICKNESS
- is the b parameter value, defined by PARAMETER B
- is the c parameter value, defined by PARAMETER C
This formula was provided by experts, who have derived this formula empirically.