Order of calculations (Water Overlay): Difference between revisions
Jump to navigation
Jump to search
No edit summary |
mNo edit summary |
||
Line 1: | Line 1: | ||
During the calculation, multiple facets have to be calculated. In each timestep, each aspect of the calculation has to be performed. Although as timesteps become smaller, the exact order of operation becomes less important, the order of operations can lead to specific behavioral details in some | During the calculation, multiple facets have to be calculated. In each timestep, each aspect of the calculation has to be performed. Although as timesteps become smaller, the exact order of operation becomes less important, the order of operations can lead to specific behavioral details in some uncommon situations. | ||
Calculations are performed in the following order: | Calculations are performed in the following order: |
Revision as of 12:18, 13 June 2019
During the calculation, multiple facets have to be calculated. In each timestep, each aspect of the calculation has to be performed. Although as timesteps become smaller, the exact order of operation becomes less important, the order of operations can lead to specific behavioral details in some uncommon situations.
Calculations are performed in the following order:
- Horizontal surface flow and horizontal underground flow
- Rain
- Building storage
- Sewer inflow
- Surface evaporation
- Groundwater evaporation (saturated zone)
- Groundwater evaporation (unsaturated zone)
- Underground infiltration
- Surface infiltration
- Exfiltration
- Hydrological constructions (culverts, weirs, pumps, in- and outlets, outlets)
- Hydrological areas (sewer overflow, breach in- and outflow)
- Chemical movement, based on the water flow and infiltration which has occurred