Multi Scenario: Difference between revisions
Jump to navigation
Jump to search
(Created page with "{{learned|how the Multi stakeholders tab relates to the {{software}}|the general layout of the Multi stakeholders tab|what options are available through the Multi stakeholders...") |
No edit summary |
||
Line 2: | Line 2: | ||
==How does the Multi stakeholders tab relate to the {{software}}== | ==How does the Multi stakeholders tab relate to the {{software}}== | ||
The Multi stakeholders tab is the third of the four ribbon tabs and is located in the top part of the editor. The Multi | The Multi stakeholders tab is the third of the four ribbon tabs and is located in the top part of the editor. The Multi Stakeholder tab contains the options to design a story for a multi-stakeholder analyses. This consists of managing stakeholders, designing story with levels, a timeline and messages and project explanation with intro tests and interface options. | ||
[[File:Q1-2016-EditorPanel.jpg|thumb|400px|left|The editor. The | [[File:Q1-2016-EditorPanel.jpg|thumb|400px|left|The editor. The Multi stakeholders tab is located in the ribbon bar at the top of the editor.]] | ||
<br clear=left> | <br clear=left> | ||
===Multi Stakeholder=== | |||
[[File:Editor_ribbon_header_multistakeholder.jpg|850px|thumb|left|]]<br clear=all> | |||
*[[Test Run]] | |||
*[[Stakeholders]] | |||
*[[Levels]] | |||
*[[Timeline]] | |||
*[[Messages]] | |||
*[[Intro Texts]] | |||
*[[Interface]] | |||
*[[Playable Stakeholders]] |
Revision as of 13:00, 6 November 2019
How does the Multi stakeholders tab relate to the Tygron Platform
The Multi stakeholders tab is the third of the four ribbon tabs and is located in the top part of the editor. The Multi Stakeholder tab contains the options to design a story for a multi-stakeholder analyses. This consists of managing stakeholders, designing story with levels, a timeline and messages and project explanation with intro tests and interface options.
Multi Stakeholder