Min area (Watershed Overlay): Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 12: | Line 12: | ||
==How-to's== | ==How-to's== | ||
* [[How | * [[How to add and remove an Attribute]] | ||
{{WatershedOverlay_model_attribute_nav}} | {{WatershedOverlay_model_attribute_nav}} |
Revision as of 12:26, 15 June 2020
Notes
- Only waterways and bodies with the required minimum size can become an additional discharge areas.
- Water cells initialized to an independent discharge area can still be reassigned to a prioritized discharge area during the first propagation step of the watershed algorithm.
How-to's