Min area (Watershed Overlay): Difference between revisions
Jump to navigation
Jump to search
No edit summary |
mNo edit summary |
||
(6 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
{{Overlay | {{Overlay attributes|<onlyinclude> | ||
|attribute= | {{Overlay attributes|type=row|overlay=Watershed | ||
|attribute=MIN AREA | |||
|unit=m2 | |unit=m2 | ||
|description=A minimal area size threshold for water terrains in order to be taken into account as an independent discharge areas | |description=A minimal area size threshold for water terrains in order to be taken into account as an [[Discharge remaining water (Watershed Overlay)|independent discharge areas]]. | ||
|defaultvalue=100 | |defaultvalue=100 | ||
|icon=watershedwizard_icon_min_area.png | |||
}}</onlyinclude>}} | |||
{{article end | |||
|notes= | |||
* Only waterways and bodies with the required minimum size can become an additional [[Discharge area (Watershed Overlay)|discharge areas]]. | |||
* Water cells initialized to an independent discharge area can still be reassigned to a prioritized discharge area during the first propagation step of the watershed algorithm. | |||
|howtos= | |||
* [[How to add and remove an Attribute]] | |||
}} | }} | ||
{{WatershedOverlay model attribute nav}} | |||
{{ |
Latest revision as of 11:06, 6 October 2020
Icon | Attribute | Unit | Range | Description | Default value |
---|---|---|---|---|---|
MIN AREA | m2 | A minimal area size threshold for water terrains in order to be taken into account as an independent discharge areas. | 100 |
Notes
- Only waterways and bodies with the required minimum size can become an additional discharge areas.
- Water cells initialized to an independent discharge area can still be reassigned to a prioritized discharge area during the first propagation step of the watershed algorithm.
How-to's