Min area (Watershed Overlay): Difference between revisions

From Tygron Preview Support Wiki
Jump to navigation Jump to search
No edit summary
mNo edit summary
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
{{Overlay attribute
{{Overlay attributes|<onlyinclude>
|attribute=Min area
{{Overlay attributes|type=row|overlay=Watershed
|attribute=MIN AREA
|unit=m2
|unit=m2
|description=A minimal area size threshold for water terrains in order to be taken into account as an [[Discharge remaining water (Watershed Overlay)|independent discharge areas]].  
|description=A minimal area size threshold for water terrains in order to be taken into account as an [[Discharge remaining water (Watershed Overlay)|independent discharge areas]].  
|icon=[[File:watershedwizard_icon_min_area.png]]
|defaultvalue=100
|defaultvalue=100
}}
|icon=watershedwizard_icon_min_area.png
}}</onlyinclude>}}


==Notes==
{{article end
|notes=
* Only waterways and bodies with the required minimum size can become an additional [[Discharge area (Watershed Overlay)|discharge areas]].
* Only waterways and bodies with the required minimum size can become an additional [[Discharge area (Watershed Overlay)|discharge areas]].
* Water cells initialized to an independent discharge area can still be reassigned to a prioritized discharge area during the first propagation step of the watershed algorithm.
* Water cells initialized to an independent discharge area can still be reassigned to a prioritized discharge area during the first propagation step of the watershed algorithm.
|howtos=
* [[How to add and remove an Attribute]]
}}


==How-to's==
{{WatershedOverlay model attribute nav}}
* [[How-to add and remove an attribute|Add and remove an attribute]]
 
{{WatershedOverlay_model_attribute_nav}}

Latest revision as of 11:06, 6 October 2020

Notes

  • Only waterways and bodies with the required minimum size can become an additional discharge areas.
  • Water cells initialized to an independent discharge area can still be reassigned to a prioritized discharge area during the first propagation step of the watershed algorithm.

How-to's