Prequels (Traffic NO2 Overlay): Difference between revisions

From Tygron Preview Support Wiki
Jump to navigation Jump to search
No edit summary
No edit summary
 
(One intermediate revision by one other user not shown)
Line 1: Line 1:
Prequel overlays can be linked to the [[Traffic NO2 Overlay]] to base traffic intensities for calculations on, rather than basing it on [[Construction|road]]s and their [[Attribute]]s in the [[3D World]].
Prequel overlays can be linked to the [[Traffic NO2 Overlay]] to base traffic intensities for calculations on, rather than basing it on [[Building|road]]s and their [[Attribute]]s in the [[project]].


{{Overlay prequels|suppresscategory=true|allowselflinks=true|
{{Overlay prequels|suppresscategory=true|allowselflinks=true|
Line 11: Line 11:
|notes=
|notes=
* A [[Prequel]] with a single [[timeframe]] will mean that value applies to all hours of the day. A [[Prequel]] with multiple timeframes is assumed to have 24 timeframes, with each timeframe representing a single hour of the day.
* A [[Prequel]] with a single [[timeframe]] will mean that value applies to all hours of the day. A [[Prequel]] with multiple timeframes is assumed to have 24 timeframes, with each timeframe representing a single hour of the day.
* In case a prequel is selected for a particular traffic type, the jam factor is still obtained from the existing [[Construction|road]]s, just as when no prequel is provided. The prequel only provides an alternative value for the number of traffic for that traffic type.
* In case a prequel is selected for a particular traffic type, the jam factor is still obtained from the existing [[Building|road]]s, just as when no prequel is provided. The prequel only provides an alternative value for the number of traffic for that traffic type.
}}
}}
{{TrafficNO2Overlay nav}}
{{TrafficNO2Overlay nav}}

Latest revision as of 17:44, 27 January 2023

Prequel overlays can be linked to the Traffic NO2 Overlay to base traffic intensities for calculations on, rather than basing it on roads and their Attributes in the project.


Notes

  • A Prequel with a single timeframe will mean that value applies to all hours of the day. A Prequel with multiple timeframes is assumed to have 24 timeframes, with each timeframe representing a single hour of the day.
  • In case a prequel is selected for a particular traffic type, the jam factor is still obtained from the existing roads, just as when no prequel is provided. The prequel only provides an alternative value for the number of traffic for that traffic type.