Order of calculations (Water Overlay): Difference between revisions

From Tygron Preview Support Wiki
Jump to navigation Jump to search
mNo edit summary
No edit summary
Line 12: Line 12:
* [[Infiltration model (Water Overlay)#Underground infiltration|Underground infiltration]]
* [[Infiltration model (Water Overlay)#Underground infiltration|Underground infiltration]]
* [[Infiltration model (Water Overlay)#Surface infiltration|Surface infiltration]]
* [[Infiltration model (Water Overlay)#Surface infiltration|Surface infiltration]]
* [[Seepage model (Water Overlay)|Underground seepage]]
* [[Infiltration model (Water Overlay)#Exfiltration|Exfiltration]]
* [[Infiltration model (Water Overlay)#Exfiltration|Exfiltration]]
* Hydrological constructions ([[culvert (Water Overlay)|culvert]]s, [[weir (Water Overlay)|weir]]s, [[pump (Water Overlay)|pump]]s, [[inlet (Water Overlay)|in- and outlets]])
* Hydrological constructions ([[culvert (Water Overlay)|culvert]]s, [[weir (Water Overlay)|weir]]s, [[pump (Water Overlay)|pump]]s, [[inlet (Water Overlay)|in- and outlets]])

Revision as of 11:43, 10 July 2020

During the calculation, multiple facets have to be calculated. In each timestep, each aspect of the calculation has to be performed. Although as timesteps become smaller, the exact order of operation becomes less important, the order of operations can lead to specific behavioral details in some uncommon situations.

Calculations are performed in the following order: