Min area (Watershed Overlay): Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 2: | Line 2: | ||
|attribute=Min area | |attribute=Min area | ||
|unit=m2 | |unit=m2 | ||
|description=A minimal area size threshold for water terrains in order to be taken into account as an [[Discharge remaining | |description=A minimal area size threshold for water terrains in order to be taken into account as an [[Discharge remaining water (Watershed Overlay)|independent discharge areas]]. Water cells initialized to an independent discharge area can still be reassigned to a prioritized discharge area during the first propagation step of the watershed algorithm. | ||
|icon=[[File:watershedwizard_icon_min_area.png]] | |icon=[[File:watershedwizard_icon_min_area.png]] | ||
|defaultvalue=100 | |defaultvalue=100 |