How to adjust Demolition Costs: Difference between revisions

From Tygron Preview Support Wiki
Jump to navigation Jump to search
No edit summary
No edit summary
Line 6: Line 6:
|Open Edit Function values
|Open Edit Function values
|Use the bottom scroll bar to navigate to the right
|Use the bottom scroll bar to navigate to the right
|By double clicking on the value the Demolition Cost can be adjusted
|By double-clicking on the value, the Demolition Cost can be adjusted
|}}
|}}


==See also==
==See also==
* [[Cost]]
* [[Cost]]

Revision as of 09:30, 22 September 2020

The Demolition cost (Function_Value) can be adjusted in the Function Value panel. These costs are displayed in an amount of money x 1,000/ surface unit. Currency and measurement units depend on the selected region (localization) of the project.

Adjusting Demolition Costs during a session
Editor → Current Situation (Ribbon tab) → Buildings (Ribbon bar) → Edit Function Values (Dropdown)
How to How to adjust Demolition Costs:
  1. Open Edit Function values
  2. Use the bottom scroll bar to navigate to the right
  3. By double-clicking on the value, the Demolition Cost can be adjusted

See also