Demolition cost (Function Value)
Revision as of 11:16, 8 October 2020 by Rudolf@tygron.nl (talk | contribs)
Function value | Attribute | Unit | Per category | Range | Description |
---|---|---|---|---|---|
Demolition cost | DEMOLISH_COST_M2 | currency/m² | Yes | How much it costs to demolish this construction during a session. If the construction is not vacant, the buyout costs are applicable as well, in addition to the demolition costs. |
Values
- The default values for this Function Value are based on expert data consulted in past projects, such as the ClimateGame.
- The default values are not overwritten during the creation of a new project.