How to setup a flooding overlay with iterations

From Tygron Preview Support Wiki
Revision as of 15:31, 19 January 2026 by Frank@tygron.nl (talk | contribs)
Jump to navigation Jump to search

This how-to explains setting up a project such that it is iterated, with each iteration performing a part of the total simulation time of a Flooding Overlay. An indicator excel is used to progress the partial start and end time of the simulation. Combo Overlays of Flooding Overlay results, configured with the previous option, serve as in and output for the Flooding Overlay. Relevant results are captured using an Iteration Collector Overlay.