How to setup a flooding overlay with iterations

From Tygron Preview Support Wiki
Revision as of 15:45, 19 January 2026 by Frank@tygron.nl (talk | contribs)
Jump to navigation Jump to search

This how-to explains setting up a project such that it is iterated, with each iteration performing a part of the total simulation time of a Flooding Overlay. An indicator excel is used to progress the partial start and end time of the simulation. Combo Overlays of Flooding Overlay results, configured with the previous option, serve as in and output for the Flooding Overlay. Relevant results are captured using an Iteration Overlay.

How to setup a flooding overlay with iterations:
  1. Setup the Flooding Overlay
  2. Add the Combo Overlays
  3. Setup the Iteration Overlay
  4. Add the Iteration Indicator

Setup the Flooding Overlay

How to setup a flooding overlay with iterations:
  1. Setup the Flooding Overlay
  2. Add a new Flooding Overlay
  3. Open the Flooding Overlay Wizard
  4. Continue to the Flood Event step.
  5. Set the groundwater option to None.
  6. Continue to the Output Overlays step.
  7. Select the output results: Surface Last Value, Surface Last U, Surface Last V.
  8. Continue to the Timeframe step
  9. Set the amount of timeframes to 1.
  10. Close the wizard.

Add the Combo Overlays

Setup the Iteration Overlay

Add the Iteration Indicator