Global

From Tygron Support wiki
Jump to navigation Jump to search

Template:Learned

Global

A global is a number that is integrated in the project but is not necessarily assigned to a specific construction. The global can be used for example, in Excel calculations and influence the calculation of an Excel indicator.

Type of globals

There is one type of global that can be applied in different ways. A global is always made up of a name of the global and a number. Based on the purpose of the global the number represent an amount or a value which is specified by the name of the global.

Output

By making use of the SELECT_GLOBAL_WHERE_NAME_IS_GLOBALID query in an Excel you can use globals to create output. It is also possible to connect the global to the budget of a specific stakeholder to directly influence the budget during a session.

Input

By making use of the UPDATE_GLOBAL statement in generating a query for an Excel, the global is used to generate input by an Excel calculation. The second way of using a global as input is by connecting the global to an Event Bundel. The value of the global can be used in the event to influence an indicator.

Add and remove Globals

Template:Editor ribbon

The Left Panel allows you to add, duplicate, and remove globals.
How to add a global:
  1. In the ribbon header, select "Indicators".
  2. In the ribbon bar, select "Globals".
  3. In the left panel, select "Add".
How to duplicate a global:
  1. In the ribbon header, select "Indicators".
  2. In the ribbon bar, select "Globals".
  3. In the left panel, select the global you wish to duplicate.
  4. In the left panel, select "Duplicate".
How to remove a global:
  1. In the ribbon header, select "Indicators".
  2. In the ribbon bar, select "Globals".
  3. In the left panel, select the global you wish to remove.
  4. In the left panel, select "Remove".


How to edit Globals

Template:Editor ribbon

Selecting a global makes its static properties adjustable in the Right Panel.
Selecting a global in the left panel makes its properties adjustable in the right panel.


Left panel: Global properties

Name

Each global has a name, this is shown in the left panel in the list of all globals that are created in the project. The global Name is the name of the Global ID which is used in queries.

Visualization Name

The Visualization Name is the name that is visual in the budget indicator en is Set Point is used, the name that is visible in the 3D world.

Start Value

The value that is represented with this global.

Assign to Budget

With this checkbox you can decide if you want to attach the value to the budget of a certain stakeholder or not. If you check this box the value is automatically counted as money for the budget.

Stakeholder

The stakeholder dropdown menu is only available when the checkbox is checked. Here you decide to which of the stakeholder you attach the budget value to.

Remove Point

With the remove point option you can clear the set point from this global you have selected on the right panel.

Set Point

With the set point option you can attach the global to a specific point in the 3D world. This can be a construction or a point in the map where there is no construction. With this option you can make the value of the global visual at all times in the 3D world.

Stakeholder properties

Global Uses

When you have created a global the can be used communicate with a Microsoft Excel spreadsheet, when using such a spreadsheet for a (custom) Excel Indicator. Also, globals are currently used to attach to event bundels and hereby influence the progress of indicators. Read more about how to connect the global to an Event Bundel on the events page.