How to adjust Demolition Costs: Difference between revisions

From Tygron Support wiki
Jump to navigation Jump to search
No edit summary
No edit summary
Line 1: Line 1:
The [[Demolition cost (Function_Value)]] can be adjusted in the Function Value panel. These costs are displayed in an amount of money x 1,000/ surface unit. Currency and measurement units depend on the selected region (localization) of the project.
The [[Demolition cost (Function_Value)]] can be adjusted in the Function Value panel. These costs are displayed in an amount of money x 1,000/ surface unit. [[Currency]] and measurement units depend on the selected [[Function#Regions|region (localization)]] of the project.
[[File:Demolition_Cost.JPG|350px|thumb|Adjusting Demolition Costs during a session]]
[[File:Demolition_Cost.JPG|350px|thumb|Adjusting Demolition Costs during a session]]
{{editor location|function values}}
{{editor location|function values}}

Revision as of 15:51, 29 October 2020

The Demolition cost (Function_Value) can be adjusted in the Function Value panel. These costs are displayed in an amount of money x 1,000/ surface unit. Currency and measurement units depend on the selected region (localization) of the project.

Adjusting Demolition Costs during a session
Editor → Current Situation (Ribbon tab) → Buildings (Ribbon bar) → Edit Function Values (Dropdown)
How to How to adjust Demolition Costs:
  1. Open Edit Function values
  2. Use the bottom scroll bar to navigate to the right
  3. By double-clicking on the value, the Demolition Cost can be adjusted

See also