Order of calculations (Water Overlay): Difference between revisions

From Tygron Support wiki
Jump to navigation Jump to search
No edit summary
mNo edit summary
Line 7: Line 7:
* [[Storage model (Water Overlay)|Building storage]]
* [[Storage model (Water Overlay)|Building storage]]
* [[Sewer model (Water Overlay)|Sewer inflow]]
* [[Sewer model (Water Overlay)|Sewer inflow]]
* [[Evaporation model (Water Overlay)#Surface evaporation model|Surface evaporation]]
* [[Evaporation model (Water Overlay)#Surface evaporation|Surface evaporation]]
* [[Evaporation model (Water Overlay)#Underground evaporation model|Groundwater evaporation (saturated zone)]]
* [[Evaporation model (Water Overlay)#Underground evaporation|Groundwater evaporation (saturated zone)]]
* [[Evaporation model (Water Overlay)|Groundwater evaporation (unsaturated zone)]]
* [[Evaporation model (Water Overlay)#Underground evaporation|Groundwater evaporation (unsaturated zone)]]
* [[Infiltration model (Water Overlay)#Underground infiltration|Underground infiltration]]
* [[Infiltration model (Water Overlay)#Underground infiltration|Underground infiltration]]
* [[Infiltration model (Water Overlay)#Surface infiltration|Surface infiltration]]
* [[Infiltration model (Water Overlay)#Surface infiltration|Surface infiltration]]

Revision as of 12:21, 1 July 2019

During the calculation, multiple facets have to be calculated. In each timestep, each aspect of the calculation has to be performed. Although as timesteps become smaller, the exact order of operation becomes less important, the order of operations can lead to specific behavioral details in some uncommon situations.

Calculations are performed in the following order: