Min max elevation (Water Overlay): Difference between revisions
Jump to navigation
Jump to search
No edit summary |
mNo edit summary |
||
| (7 intermediate revisions by 3 users not shown) | |||
| Line 2: | Line 2: | ||
{{Overlay attributes|type=row|overlay=Water | {{Overlay attributes|type=row|overlay=Water | ||
|attribute=MIN_MAX_ELEVATION | |attribute=MIN_MAX_ELEVATION | ||
|unit= | |unit=Nominal value | ||
|range=0 to 2 | |||
|description=Whether to use highest and lowest elevations found for a grid cell for land and water respectively when interpreting the elevation model. | |description=Whether to use highest and lowest elevations found for a grid cell for land and water respectively when interpreting the elevation model. | ||
|icon= | |icon=waterwizard_icon_min_max_elevation.png | ||
|defaultvalue=1 | |defaultvalue=1 | ||
}}</onlyinclude>}} | }}</onlyinclude>}} | ||
In situations where the calculation grid size is larger than the elevation model's accuracy, the values for the elevation model are averaged per grid cell to compute a matching elevation model. This setting computes multiple averages | In situations where the calculation grid size is larger than the elevation model's accuracy, the values for the elevation model are averaged per grid cell to compute a matching elevation model. This setting computes multiple averages, and the highest value to be used if the grid cell is land, and the lowest value to be used if the grid cell is water. This allows smaller waterways to be preserved better when the interpreted elevation model for the [[Water Overlay]]'s calculations is less accurate (in other words, has a larger grid cell size). | ||
{{nominal list|zeroindex=true | |||
|| '''Never''' : This option is inactive. | |||
|| '''Cell >{{=}} 2m''': This option is active for cells larger than 2 meters. | |||
|| '''Always''': This option is always active. | |||
}} | |||
{{article end | {{article end | ||
|notes= | |notes= | ||
|seealso= | |seealso= | ||
* [[Elevation model (Water Overlay)]] | * [[Elevation model (Water Overlay)]] | ||
Latest revision as of 11:37, 30 October 2025
| Icon | Attribute | Unit | Range | Description | Default value |
|---|---|---|---|---|---|
| |
MIN_MAX_ELEVATION | Nominal value | 0 to 2 | Whether to use highest and lowest elevations found for a grid cell for land and water respectively when interpreting the elevation model. | 1 |
In situations where the calculation grid size is larger than the elevation model's accuracy, the values for the elevation model are averaged per grid cell to compute a matching elevation model. This setting computes multiple averages, and the highest value to be used if the grid cell is land, and the lowest value to be used if the grid cell is water. This allows smaller waterways to be preserved better when the interpreted elevation model for the Water Overlay's calculations is less accurate (in other words, has a larger grid cell size).
| 0. | Never : This option is inactive. |
| 1. | Cell >= 2m: This option is active for cells larger than 2 meters. |
| 2. | Always: This option is always active. |




