Bottom resistance prequel (Water Overlay): Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
(9 intermediate revisions by 2 users not shown) | |||
Line 4: | Line 4: | ||
|name=Bottom Resistance | |name=Bottom Resistance | ||
|unit=days | |unit=days | ||
|description=A grid of values containing the resistance of the lower layer against the | |description=A grid of values containing the resistance of the lower layer against the bottom boundary flow. | ||
|min=0 | |min=0 | ||
|max=1000000 | |max=1000000 | ||
Line 13: | Line 13: | ||
|notes=* The unit is: the number of days it would take to equalize 1 meter of the local groundwater table level with the higher region's water head. (days) | |notes=* The unit is: the number of days it would take to equalize 1 meter of the local groundwater table level with the higher region's water head. (days) | ||
* The values in this prequel grid are clamped between 0 and 1000000. No data values are therefore not allowed, but could be clamped to zero when negative leading to the same result. | * The values in this prequel grid are clamped between 0 and 1000000. No data values are therefore not allowed, but could be clamped to zero when negative leading to the same result. | ||
|seealso=* [[ | * This prequel can also have multiple input frames. In this case the values will be updated linear throughout the simulation period. For example 5 input frames over a 10 day simulation period result in a new value every two days. | ||
* [[ | * Note: Input frames are not linked to the overlay's output [[Timeframes_(Water_Overlay)|timeframes]]. | ||
|seealso=* [[Ground bottom flow formula (Water Overlay)]] | |||
* [[Ground bottom pressure m (Water Overlay)]] | |||
* [[Ground bottom flow result type (Water Overlay)]] | * [[Ground bottom flow result type (Water Overlay)]] | ||
* [[ | * [[Ground model (Water Overlay)]]}} | ||
{{WaterOverlay simulation data nav}} | {{WaterOverlay simulation data nav}} |
Latest revision as of 16:13, 26 January 2024
Name | Prequel | Underlying data | Unit | Range | No data | Description |
---|---|---|---|---|---|---|
Bottom Resistance | BOTTOM_RESISTANCE | Water Prequel | days | 0 to 1000000 | Clamped to range | A grid of values containing the resistance of the lower layer against the bottom boundary flow. |
Notes
- The unit is: the number of days it would take to equalize 1 meter of the local groundwater table level with the higher region's water head. (days)
- The values in this prequel grid are clamped between 0 and 1000000. No data values are therefore not allowed, but could be clamped to zero when negative leading to the same result.
- This prequel can also have multiple input frames. In this case the values will be updated linear throughout the simulation period. For example 5 input frames over a 10 day simulation period result in a new value every two days.
- Note: Input frames are not linked to the overlay's output timeframes.