Bottom pressure prequel (Water Overlay): Difference between revisions

From Tygron Preview Support Wiki
Jump to navigation Jump to search
No edit summary
No edit summary
 
(One intermediate revision by the same user not shown)
Line 11: Line 11:


{{article end
{{article end
|notes=* The unit is: Groundwater head of higher regions. (m + datum)
|notes=
* The values in this prequel grid are clamped between -1000000.0 and 1000000. No data values are therefore not allowed.
* The values in this prequel grid are clamped between -1000000.0 and 1000000. No data values are therefore not allowed.
* This prequel can also have multiple input frames. In this case the values will be updated linear throughout the simulation period. For example 5 input frames over a 10 day simulation period result in a new value every two days.
* This prequel can also have multiple input frames. In this case the values will be updated linear throughout the simulation period. For example 5 input frames over a 10 day simulation period result in a new value every two days.
* Note: Input frames are not linked to the overlay's output [[Timeframes_(Water_Overlay)|timeframes]].
* Note: Input frames are not linked to the overlay's output [[Timeframes_(Water_Overlay)|timeframes]].
|seealso=* [[Underground seepage formula (Water Overlay)]]
|seealso=* [[Ground bottom flow formula (Water Overlay)]]
* [[Ground bottom pressure m (Water Overlay)]]
* [[Ground bottom pressure m (Water Overlay)]]
* [[Ground bottom flow result type (Water Overlay)]]
* [[Ground bottom flow result type (Water Overlay)]]
* [[Underground model (Water Overlay)]]
* [[Ground model (Water Overlay)]]
}}
}}


{{WaterOverlay simulation data nav}}
{{WaterOverlay simulation data nav}}

Latest revision as of 16:14, 26 January 2024


Notes

  • The values in this prequel grid are clamped between -1000000.0 and 1000000. No data values are therefore not allowed.
  • This prequel can also have multiple input frames. In this case the values will be updated linear throughout the simulation period. For example 5 input frames over a 10 day simulation period result in a new value every two days.
  • Note: Input frames are not linked to the overlay's output timeframes.

See also