Ground conductivity prequel (Water Overlay): Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
(5 intermediate revisions by the same user not shown) | |||
Line 5: | Line 5: | ||
|description=Used for initializing the ground conductivity, with or without thickness. | |description=Used for initializing the ground conductivity, with or without thickness. | ||
|range=0 10000 | |range=0 10000 | ||
|unit=m2/day or m/day | |unit=m2/day or m/day | ||
}}</onlyinclude>}} | }}</onlyinclude>}} | ||
Line 14: | Line 13: | ||
|seealso= | |seealso= | ||
* [[Hydraulic conductivity with thickness (Water Overlay)]] | * [[Hydraulic conductivity with thickness (Water Overlay)]] | ||
* [[ | * [[Terrain hydraulic conductivity md (Water Overlay)]] | ||
* [[Terrain hydraulic conductivity with thickness md (Water Overlay)]] | |||
}} | }} | ||
{{WaterOverlay simulation data nav}} | {{WaterOverlay simulation data nav}} |
Latest revision as of 13:36, 25 January 2024
Name | Prequel | Underlying data | Unit | Range | No data | Description |
---|---|---|---|---|---|---|
Ground conductivity | GROUND_CONDUCTIVITY | Water Prequel | m2/day or m/day | 0 10000 | Clamped to range | Used for initializing the ground conductivity, with or without thickness. |
Notes
- Whether or not this prequel should be interpreted as ground conductivity with or without thickness, is configured using the model attribute Hydraulic conductivity with thickness (Water Overlay).
- The unit used also depends on whether the prequel represents ground conductivity with or ground conductivity without thickness.