Version 2018.1.1: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 10: | Line 10: | ||
** Avg: Average between other options. | ** Avg: Average between other options. | ||
** Accuracy: Takes very long to calculate, but makes sure that even in hilly landscapes (higher water movement) the courant number is always below one. | ** Accuracy: Takes very long to calculate, but makes sure that even in hilly landscapes (higher water movement) the courant number is always below one. | ||
'''License''' | '''License''' |
Revision as of 07:41, 20 December 2017
Version 2018.1.1 was released on engine.tygron.com (LTS) on Tuesday December 19th 2017
Performance
- Previously created overlays are now stored, this allows for faster Project startup times.
Rain
- No longer needed to set the amount of cycles. You can select three options that automatically set the correct amount of cycles:
- Fast: Fastest result for e.g. live session, in most urban flatland cases this will result in the same answer as options below.
- Avg: Average between other options.
- Accuracy: Takes very long to calculate, but makes sure that even in hilly landscapes (higher water movement) the courant number is always below one.
License
- You can now see the amount of newly created projects in your license overview panel.
GeoTiff
- Uses the NO_DATA tag from the file to set the nodata available threshold value.
- Added more feedback for user when invalid GeoTiff is uploaded or when outside the Project Area.