Version 2018.1.1
Jump to navigation
Jump to search
Version 2018.1.1 was released on engine.tygron.com (LTS) on Tuesday December 19th 2017
Rain
- No longer needed to set the amount of cycles. You can select three options that automatically set the correct amount of cycles:
- Fast: Fastest result for e.g. live session, in most urban flatland cases this will result in the same answer as options below.
- Avg: Average between other options.
- Accuracy: Takes very long to calculate, but makes sure that even in hilly landscapes (higher water movement) the courant number is always below one.
License
- You can now see the amount of newly created projects in your license overview panel.
GeoTiff
- Uses the NO_DATA tag from the file to set the nodata available threshold value.
- Added more feedback for user when invalid GeoTiff is uploaded or when outside the Project Area.