How to edit measure events: Difference between revisions

From Tygron Preview Support Wiki
Jump to navigation Jump to search
(Created page with "{{Editor location|measure events}} frame|left|The right panel allows you to edit events of a [[measure.]] ====Event lists==== frame|right|The dropdown to switch between lists of events.''Measures have 4 distinct lists of events. Each list is related to a different state of the measure. When the measure reaches one of the following states, the related list of events will be triggered:'' *...")
 
No edit summary
Line 3: Line 3:


====Event lists====
====Event lists====
[[File:Measures-right-events-list-selector.jpg|frame|right|The dropdown to switch between lists of events.]]''Measures have 4 distinct lists of events. Each list is related to a different state of the measure. When the measure reaches one of the following states, the related list of events will be triggered:''
[[File:Measures-right-events-list-selector.jpg|frame|right|The dropdown to switch between lists of events.]]''Measures have two distinct lists of events. Each list is related to a different state of the measure. When the measure reaches one of the following states, the related list of events will be triggered:''
* ''Measure construction planned''
* ''Measure construction planned''
* ''Measure construction cancelled''
* ''Measure construction cancelled''
* ''Measure construction started''
* ''Measure construction finished''
''The right panel allows you to switch between the lists of events connected to the measure.''
''The right panel allows you to switch between the lists of events connected to the measure.''


====Adding, removing, and editing events====
====Adding, removing, and editing events====
{{:Editing Events}}{{clear}}
{{:Editing Events}}{{clear}}

Revision as of 10:48, 13 February 2023

Editor → Future Design (Ribbon tab) → Measures (Ribbon bar) → The Measure to edit (Left panel) → Events (Sub-option)
The right panel allows you to edit events of a measure.

Event lists

The dropdown to switch between lists of events.

Measures have two distinct lists of events. Each list is related to a different state of the measure. When the measure reaches one of the following states, the related list of events will be triggered:

  • Measure construction planned
  • Measure construction cancelled

The right panel allows you to switch between the lists of events connected to the measure.

Adding, removing, and editing events

For the exact steps for adding, removing, and changing events, please see Editing Events.