Bottom resistance prequel (Water Overlay): Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 13: | Line 13: | ||
|notes=* The unit is: the number of days it would take to equalize 1 meter of the local groundwater table level with the higher region's water head. (days) | |notes=* The unit is: the number of days it would take to equalize 1 meter of the local groundwater table level with the higher region's water head. (days) | ||
* The values in this prequel grid are clamped between 0 and 1000000. No data values are therefore not allowed, but could be clamped to zero when negative leading to the same result. | * The values in this prequel grid are clamped between 0 and 1000000. No data values are therefore not allowed, but could be clamped to zero when negative leading to the same result. | ||
* This prequel can also have multiple input frames. In this case the values will be updated linear throughout the simulation period. For example 5 input frames over a 10 day simulation period result in a new value every two days. Note: input frames are not linked to the overlay's output timeframes. | * This prequel can also have multiple input frames. In this case the values will be updated linear throughout the simulation period. For example 5 input frames over a 10 day simulation period result in a new value every two days. Note: input frames are not linked to the overlay's output [[Timeframes_(Water_Overlay)|timeframes]]. | ||
|seealso=* [[Underground seepage formula (Water Overlay)]] | |seealso=* [[Underground seepage formula (Water Overlay)]] | ||
* [[Seepage fluctuation (Water Overlay)]] | * [[Seepage fluctuation (Water Overlay)]] |
Revision as of 11:35, 12 January 2024
Name | Prequel | Underlying data | Unit | Range | No data | Description |
---|---|---|---|---|---|---|
Bottom Resistance | BOTTOM_RESISTANCE | Water Prequel | days | 0 to 1000000 | Clamped to range | A grid of values containing the resistance of the lower layer against the seepage. |
Notes
- The unit is: the number of days it would take to equalize 1 meter of the local groundwater table level with the higher region's water head. (days)
- The values in this prequel grid are clamped between 0 and 1000000. No data values are therefore not allowed, but could be clamped to zero when negative leading to the same result.
- This prequel can also have multiple input frames. In this case the values will be updated linear throughout the simulation period. For example 5 input frames over a 10 day simulation period result in a new value every two days. Note: input frames are not linked to the overlay's output timeframes.