Bottom pressure prequel (Water Overlay): Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 12: | Line 12: | ||
|notes=* The unit is: Groundwater head of higher regions. (m + datum) | |notes=* The unit is: Groundwater head of higher regions. (m + datum) | ||
* The values in this prequel grid are clamped between -1000000.0 and 1000000. No data values are therefore not allowed. | * The values in this prequel grid are clamped between -1000000.0 and 1000000. No data values are therefore not allowed. | ||
* This prequel can also have multiple input frames. In this case the values will be updated linear throughout the simulation period. For example 5 input frames over a 10 day simulation period result in a new value every two days. Note: | * This prequel can also have multiple input frames. In this case the values will be updated linear throughout the simulation period. For example 5 input frames over a 10 day simulation period result in a new value every two days. | ||
* Note: Input frames are not linked to the overlay's output [[Timeframes_(Water_Overlay)|timeframes]]. | |||
|seealso=* [[Underground seepage formula (Water Overlay)]] | |seealso=* [[Underground seepage formula (Water Overlay)]] | ||
* [[Seepage fluctuation (Water Overlay)]] | * [[Seepage fluctuation (Water Overlay)]] |
Revision as of 11:36, 12 January 2024
Name | Prequel | Underlying data | Unit | Range | No data | Description |
---|---|---|---|---|---|---|
Bottom Pressure | BOTTOM_PRESSURE | Water Prequel | -1000000 to 1000000 | Clamped to range | A grid of values containing the head of the ground water pressure caused by ground water in higher regions outside the project area. |
Notes
- The unit is: Groundwater head of higher regions. (m + datum)
- The values in this prequel grid are clamped between -1000000.0 and 1000000. No data values are therefore not allowed.
- This prequel can also have multiple input frames. In this case the values will be updated linear throughout the simulation period. For example 5 input frames over a 10 day simulation period result in a new value every two days.
- Note: Input frames are not linked to the overlay's output timeframes.