Ground conductivity prequel (Water Overlay): Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 6: | Line 6: | ||
|range=0 10000 | |range=0 10000 | ||
|defaultvalue= | |defaultvalue= | ||
|unit=m | |unit=m/day or m2/day | ||
}}</onlyinclude>}} | }}</onlyinclude>}} | ||
Revision as of 08:42, 25 January 2024
Name | Prequel | Underlying data | Unit | Range | No data | Description |
---|---|---|---|---|---|---|
Ground conductivity | GROUND_CONDUCTIVITY | Water Prequel | m/day or m2/day | 0 10000 | Used for initializing the ground conductivity, with or without thickness. |
Notes
- Whether or not this prequel should be interpreted as ground conductivity with or without thickness, is configured using the model attribute Hydraulic conductivity with thickness (Water Overlay).