Cost: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
|||
Line 4: | Line 4: | ||
==What is a Cost?== | ==What is a Cost?== | ||
The cost is the quantity of [[currency]] needed to execute or perform a certain action type during a [[session]]. An example of a cost can be the currency needed to build a building. The cost of an action can be influenced by a wide variety of different factors (e.g. height or building type). | The cost is the quantity of [[currency]] needed to execute or perform a certain action type during a [[session]]. An example of a cost can be the currency needed to build a building. The cost of an action can be influenced by a wide variety of different factors (e.g. height or building type). | ||
This is an overview of costs as a function value during an session: | |||
* [[Construction_cost_(Function_Value)|Constuction Cost]] | * [[Construction_cost_(Function_Value)|Constuction Cost]] | ||
* [[Buyout_cost_(Function_Value)|Buyout Cost]] | * [[Buyout_cost_(Function_Value)|Buyout Cost]] |
Revision as of 13:19, 16 September 2020
What is a Cost?
The cost is the quantity of currency needed to execute or perform a certain action type during a session. An example of a cost can be the currency needed to build a building. The cost of an action can be influenced by a wide variety of different factors (e.g. height or building type). This is an overview of costs as a function value during an session:
How does a Cost relate to the Tygron Platform?
The Budget (Indicator) of a stakeholder is influenced by the amount of costs the stakeholder makes during a game. Each action, correction or measure has a different cost profile. It is possible to adjust the various costs functions of a feature manually in the category management.