Timeframes (Water Overlay): Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 9: | Line 9: | ||
==How-to's== | ==How-to's== | ||
* [[How to set custom timeframes]] | |||
* [[How to add and remove an Attribute]] | * [[How to add and remove an Attribute]] | ||
{{WaterOverlay_model_attribute_nav}} | {{WaterOverlay_model_attribute_nav}} |
Revision as of 08:45, 30 September 2020
Notes
- The total simulation time is divided by this value, and at each interval of that period of time a snapshot of the results so far is made. Note that the first timeframe does not contain the starting conditions of the simulation, but the state of the simulation after the first period of time has passed.
- The amount of timeframes does not impact the calculation time or the simulation time.