Bottom resistance prequel (Water Overlay): Difference between revisions

From Tygron Preview Support Wiki
Jump to navigation Jump to search
No edit summary
No edit summary
Line 6: Line 6:
|notes=* The unit is: the number of days it would take to equalize 1 meter of the local groundwater table level with the higher region's water head. (days)
|notes=* The unit is: the number of days it would take to equalize 1 meter of the local groundwater table level with the higher region's water head. (days)
* The values in this prequel grid are clamped between 0 and 1000000. No data values are therefore not allowed, but could be clamped to zero when negative leading to the same result.
* The values in this prequel grid are clamped between 0 and 1000000. No data values are therefore not allowed, but could be clamped to zero when negative leading to the same result.
}}
|seealso=* [[Underground seepage formula (Water Overlay)]]
* [[Seepage fluctuation (Water Overlay)]]
* [[Ground last seepage result type (Water Overlay)]]
* [[Underground model (Water Overlay)]]}}


{{WaterOverlay simulation data nav}}
{{WaterOverlay simulation data nav}}

Revision as of 12:44, 10 February 2022

Notes

  • The unit is: the number of days it would take to equalize 1 meter of the local groundwater table level with the higher region's water head. (days)
  • The values in this prequel grid are clamped between 0 and 1000000. No data values are therefore not allowed, but could be clamped to zero when negative leading to the same result.

See also