Min max elevation (Water Overlay): Difference between revisions

From Tygron Preview Support Wiki
Jump to navigation Jump to search
mNo edit summary
No edit summary
Tag: Reverted
Line 6: Line 6:
|icon=
|icon=
|defaultvalue=True
|defaultvalue=True
|icon=waterwizard_icon_
}}</onlyinclude>}}
}}</onlyinclude>}}



Revision as of 08:57, 17 October 2022

In situations where the calculation grid size is larger than the elevation model's accuracy, the values for the elevation model are averaged per grid cell to compute a matching elevation model. This setting computes multiple averages to be computed, and the highest value to be used if the grid cell is land, and the lowest value to be used if the grid cell is water. This allows smaller waterways to be preserved better when the interpreted elevation model for the Water Overlay's calculations is less accurate.