Ground conductivity prequel (Water Overlay): Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 14: | Line 14: | ||
|seealso= | |seealso= | ||
* [[Hydraulic conductivity with thickness (Water Overlay)]] | * [[Hydraulic conductivity with thickness (Water Overlay)]] | ||
* [[ | * [[Terrain hydraulic conductivity md (Water Overlay)]] | ||
* [[ | * [[Terrain hydraulic conductivity md (Water Overlay)]] | ||
}} | }} | ||
{{WaterOverlay simulation data nav}} | {{WaterOverlay simulation data nav}} |
Revision as of 08:46, 25 January 2024
Name | Prequel | Underlying data | Unit | Range | No data | Description |
---|---|---|---|---|---|---|
Ground conductivity | GROUND_CONDUCTIVITY | Water Prequel | m2/day or m/day | 0 10000 | Used for initializing the ground conductivity, with or without thickness. |
Notes
- Whether or not this prequel should be interpreted as ground conductivity with or without thickness, is configured using the model attribute Hydraulic conductivity with thickness (Water Overlay).
- The unit used also depends on whether the prequel represents ground conductivity with or ground conductivity without thickness.