Ground conductivity prequel (Water Overlay): Difference between revisions
Jump to navigation
Jump to search
No edit summary Tag: Manual revert |
No edit summary |
||
Line 5: | Line 5: | ||
|description=Used for initializing the ground conductivity, with or without thickness. | |description=Used for initializing the ground conductivity, with or without thickness. | ||
|range=0 10000 | |range=0 10000 | ||
|unit=m2/day or m/day | |unit=m2/day or m/day | ||
}}</onlyinclude>}} | }}</onlyinclude>}} |
Latest revision as of 13:36, 25 January 2024
Name | Prequel | Underlying data | Unit | Range | No data | Description |
---|---|---|---|---|---|---|
Ground conductivity | GROUND_CONDUCTIVITY | Water Prequel | m2/day or m/day | 0 10000 | Clamped to range | Used for initializing the ground conductivity, with or without thickness. |
Notes
- Whether or not this prequel should be interpreted as ground conductivity with or without thickness, is configured using the model attribute Hydraulic conductivity with thickness (Water Overlay).
- The unit used also depends on whether the prequel represents ground conductivity with or ground conductivity without thickness.