Monumental (Function Value): Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 4: | Line 4: | ||
|attribute=MONUMENTAL | |attribute=MONUMENTAL | ||
|unit=[[boolean]] | |unit=[[boolean]] | ||
|category= | |category=No | ||
|range=0 to 1 | |range=0 to 1 | ||
|description=Whether this building is monumental. Monumental buildings can be disallowed for demolition by the zoning plan. | |description=Whether this building is monumental. Monumental buildings can be disallowed for demolition by the zoning plan. |
Latest revision as of 14:36, 26 January 2024
Function value | Attribute | Unit | Per category | Range | Description |
---|---|---|---|---|---|
Monumental | MONUMENTAL | boolean | No | 0 to 1 | Whether this building is monumental. Monumental buildings can be disallowed for demolition by the zoning plan. |
Values
- This Function Value does not have usable values by default.
- Buildings generated during project creation can have their values overwritten based on the zoning of ruimtelijke plannen.
Notes
- The default zoning rules state that if a zone takes monumental status into account, and a building is monumental, then demolition of that building is not allowed. If the zone does not take monumental status into account, demolition of monumental buildings is permitted.