Sewer level prequel (Water Overlay): Difference between revisions

From Tygron Preview Support Wiki
Jump to navigation Jump to search
mNo edit summary
Maxim@tygron.com (talk | contribs)
No edit summary
Line 10: Line 10:
|description=Initial filling of the sewer in M.
|description=Initial filling of the sewer in M.
|min=0
|min=0
|max=10000
|max=Sewer Storage M
}}</onlyinclude>}}
}}</onlyinclude>}}
{{article end
{{article end
|notes=
|notes=
* Initial filling of the sewer in M.
* Initial filling of the sewer in M capped by the maximum amount of storage M possible.
|seealso=
|seealso=
* [[Surface model (Water Overlay)]]
* [[Surface model (Water Overlay)]]

Revision as of 06:23, 23 September 2025

This article is a stub. The following information should be added:
  • Description of what it is and what it does and why should be in the body, before article end. Notes is for notes, subtleties, edge-case points of attention, etc.

Notes

  • Initial filling of the sewer in M capped by the maximum amount of storage M possible.

See also