Trim shoreline conductivity (Water Overlay): Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
| Line 11: | Line 11: | ||
{{article end | {{article end | ||
|notes= | |notes= | ||
* This trim can be used to adjust the waterway's bedding conductivity by | * This trim can be used to adjust the waterway's bedding conductivity by changing the [[Terrain hydraulic conductivity md (Water Overlay)|hydraulic conductivity]]. | ||
|seealso= | |seealso= | ||
*[[Terrain hydraulic conductivity md (Water Overlay)]] | *[[Terrain hydraulic conductivity md (Water Overlay)]] | ||
Revision as of 15:58, 2 December 2025
| Icon | Attribute | Unit | Range | Description | Default value |
|---|---|---|---|---|---|
| TRIM_SHORELINE_CONDUCTIVITY | number | 0 to 1000 | Trim fraction for horizontal ground conductivity around waterway shorelines, 1 is default, 0 is nothing, 1.1 is a 10% increase, etc. | 1 |
Notes
- This trim can be used to adjust the waterway's bedding conductivity by changing the hydraulic conductivity.




