Measure: Difference between revisions

From Tygron Preview Support Wiki
Jump to navigation Jump to search
Line 46: Line 46:
====Description====
====Description====
[[File:measures-right-description.jpg|frame|right|The field for the "description".]]
[[File:measures-right-description.jpg|frame|right|The field for the "description".]]
: ''The description of the measure. This will also appear in a stakeholder's list of actions when the measure is selected. In addition to the name, a good description can be necessary to convey the intent and effect of the measure. You can change this by altering the text in the text area.''<br clear=right>
: ''The description of the measure. This will also appear in a stakeholder's list of actions when the measure is selected. In addition to the name, a good description can be necessary to convey the intent and effect of the measure. You can change this by altering the text in the text area.''


===Editing additional measure properties===
===Editing additional measure properties===

Revision as of 12:01, 18 August 2015

This article is a stub.
Please note: This page is currently being updated.

Template:Learned

Measures

How measures relate to the Tygron Engine

When to use measures

Creating and editing measures

Template:Editor ribbon

Creating and removing measures

Template:Editor ribbon

File:Measures-left.jpg
The left panel allows you to select measures.
How to create a new measure:
  1. Select "Stakeholders" in the ribbon header.
  2. Select "Measures" in the ribbon bar.
  3. Select "Add" in the left panel.
How to duplicate an existing measure:
  1. Select "Stakeholders" in the ribbon header.
  2. Select "Measures" in the ribbon bar.
  3. Select an existing measure you wish to duplicate.
  4. Select "Duplicate" in the left panel.
How to remove an existing measure:
  1. Select "Stakeholders" in the ribbon header.
  2. Select "Measures" in the ribbon bar.
  3. Select the measure you wish to remove.
  4. Select "Remove" in the left panel.


Editing measure properties

Template:Editor ribbon

File:Measures-right.jpg
The right panel allows you to edit properties.

A measure has many properties that may be adjusted. The measure's general properties can be adjusted when the measure itself is selected in the left panel.

Name

The field for the "name".
The name of the measure. This is the name which will appear in a stakeholder's list of actions. Depending on the effects of the measure, it is important to provide a descriptive name. You can change this by altering the text in the text field.

Owner

The field for the "owner".
The owner of the measure. This is the stakeholder who will be considered the stakeholder performing the measure, if it is not directly enacted via a stakeholder's list of actions. You can change this by selecting a different stakeholder in the dropdown menu.

Image

The selector for the "image".
The image seen when the measure is selected in a stakeholder's list of actions. A fitting image will help users identify the measure at a glance. You can change this by clicking the image, and selecting a new image in the opened window.

Requires confirmation

File:Measures-right-confirmation.jpg
The checkbox for the property of requiring confirmation.
Whether the measure will require confirmation from other stakeholders. If this is the case, when the measure is planned, the appropriate stakeholders (such as the owners of land and buildings, and the municipality) will need to approve the measure via a popup. To change this, check or uncheck the checkbox.

Start automatically on date

File:Measures-right-date.jpg
The checkbox and field for the property of automatic starting date.
Whether the measure will automatically be performed on a given date. When the checkbox is unchecked, the measure will not be automatically performed. When the checkbox is checked, the measure will automatically be performed when the time in the session reaches the point specified in the textfield. To change this property, check or uncheck the checkbox. To change the date on which to automatically perform the measure, change the date in the text field

Description

The field for the "description".
The description of the measure. This will also appear in a stakeholder's list of actions when the measure is selected. In addition to the name, a good description can be necessary to convey the intent and effect of the measure. You can change this by altering the text in the text area.

Editing additional measure properties

In addition to the general properties of the measure, there are also a number of specific properties which can be edited.

Cost Details

Template:Editor ribbon

File:Measures-right-cost.jpg
The right panel allows you to edit properties.

Construction Time

File:Measures-right-cost-contime.jpg
The field for the "construction time".
The construction time in months. This is how long it takes in timeline projects to perform the measure. You can change this by altering the number in the "construction time" field.

Demolition Time

File:Measures-right-cost-demotime.jpg
The field for the "demolition time".
The demolition time in months. This is how long it takes in timeline projects to demolish the measure. You can change this by altering the number in the "demolition time" field.

Construction cost

The field for the "construction cost".
The construction cost. This is the impact the measure will have on the enacting stakeholder's budget when the measure is enacted. This cost is in addition to any cost brought forth by spatial aspects of the measure, such as the placement of buildings. The cost type can be set to the following values:
  • NONE (No additional costs)
  • FIXED (A fixed additonal cost)
  • VOLUME (An additional cost based on the area/volume of the spatial aspects of the measure)
You can change this by selecting the desired cost type using the dropdown, and entering or changing the number in the field below it.


Demolition cost

File:Measures-right-cost-democost.jpg
The field for the "demolition cost".
The demolition cost. This is the impact the measure will have on the enacting stakeholder's budget when the measure is demolished. This cost is in addition to any cost brought forth by spatial aspects of the measure, such as the placement of buildings. The cost type can be set to the following values:
  • NONE (No additional costs)
  • FIXED (A fixed additonal cost)
  • VOLUME (An additional cost based on the area/volume of the spatial aspects of the measure)
You can change this by selecting the desired cost type using the dropdown, and entering or changing the number in the field below it.


Fixed Water Storage

File:Measures-right-cost-water.jpg
The field for the "water storage".
The amount of water storage this measure provides for the area. You can change this by altering the number in the "Fixed water storage" field field below it.


Events

Template:Editor ribbon

The right panel allows you to edit properties.


Indicator Scores

Template:Editor ribbon

File:Measures-right-indicators.jpg
The right panel allows you to edit properties.


Editing spatial effects

Template:Editor ribbon

Buildings

Landmarks

Upgrades

Spatials