Evaporation m (Water Overlay)
Revision as of 15:27, 28 February 2024 by Frank@tygron.nl (talk | contribs)
Attribute | Unit | Description |
---|---|---|
EVAPORATION_M | end-time, m | An array of values, each pair indicating until what time that period of evaporation will last and what amount evaporates in that period. |
Notes
- A maximum of 10.000 values (5.000 pairs) can be defined.
- Internally each period with amount values are converted to an evaporation rate per second at a particular time in the simulation.
- The default value is set to 0.125 mm in 2 hours (0.000125 m in 7200 seconds), which corresponds to 1.5 mm per day. This value is based on the theory described in 2.3 Gewasverdamping<reference name="GWZ2016"/> in the book Grondwaterzakboekje. Based on the plotted lines, it was selected as an average of march, june and september, for a cloudy rainy day.
How-to's
See also
References
Cite error:<ref>
tag defined in <references>
has group attribute "" which does not appear in prior text.