Sewer level prequel (Water Overlay)
This article is a stub. The following information should be added:
- Maximum value is a text. Should be a value, or (since a cap based on attribute is new) a proper link to which attribute.
- Description of what it is and what it does and why should be in the body, before article end. Notes is for notes, subtleties, edge-case points of attention, etc.
- In "M" should be written out.
- Remove "e.g.", it is not one example among more.
| Name | Prequel | Underlying data | Unit | Range | No data | Description |
|---|---|---|---|---|---|---|
| Sewer Level | SEWER_LEVEL | Water Prequel | m | 0 to Sewer Storage M | Clamped to range | Initial filling of the sewer in M. |
Notes
- Initial filling of the sewer during e.g. iterations in M capped by the maximum amount of Storage possible.





