How to add rain barrels to your project

From Tygron Preview Support Wiki
Revision as of 14:01, 2 November 2020 by Reijn@tygron.com (talk | contribs)
Jump to navigation Jump to search

A rainbarrel can be added to a project as an action to improve garden drainage capacities, besides that it also improves the awerness of residents towards neighborhood water management.

Editor → Future Design (Ribbon tab) → Actions (Ribbon bar) → The Action Menu to edit (Left panel) → Actions tab (Right panel)
How to add a rain barrel to your project:
  1. Go to the [actions] ribbon and a ADD a new acion by pressing the Add button in the bottom left corner.
  2. A new action menu appears, modify the action in the right sided panel.
  3. Rename the Action into Rain barrel and change the image by selecting the category_waterbasket.png as image
  4. Go to the Example upgrades drop down menu in the panel on left side
  5. Select Tuinen -> Regentonnen

Notes

  • When using a WFS endpoint which only displays partial data (such as the ROADS endpoint for constructions), any submitted modification must still be valid across all data. I.e., even if you can't see other constructions in your GIS application, the modified roads are not allowed to intersect with other constructions in the project in the Tygron Platform.

See also