Evaporation m (Water Overlay)
Revision as of 15:42, 28 February 2024 by Frank@tygron.nl (talk | contribs)
Attribute | Unit | Description |
---|---|---|
EVAPORATION_M | end-time, m | An array of values, each pair indicating until what time that period of evaporation will last and what amount evaporates in that period. |
Notes
- A maximum of 10.000 values (5.000 pairs) can be defined.
- Internally each period with amount values are converted to an evaporation rate per second at a particular time in the simulation.
- The default value is set to 0.125 mm in 2 hours (0.000125 m in 7200 seconds), which corresponds to 1.5 mm per day. This value is derived from the theory described in 2.3 Gewasverdamping[1] in the book Grondwaterzakboekje, which combines the formula of Makkink with a temperature dependent factor (which is approximately linear between 0 and 24 C). Based on the plotted lines, it was selected as an average of march, june and september, for a cloudy rainy day, which corresponds to a heavy rainfall event.
How-to's
See also
References
- ↑ Fig. 2.7 referentiegewasverdamping Gewasfactoren, Bram Bot (2016) ∙ Grondwaterzakboekje, Gwz2016 ∙ Impressed druk en print Cite error: Invalid
<ref>
tag; name "GWZ2016" defined multiple times with different content