Ground conductivity prequel (Water Overlay): Difference between revisions

From Tygron Support wiki
Jump to navigation Jump to search
No edit summary
No edit summary
 
(7 intermediate revisions by the same user not shown)
Line 5: Line 5:
|description=Used for initializing the ground conductivity, with or without thickness.
|description=Used for initializing the ground conductivity, with or without thickness.
|range=0 10000
|range=0 10000
|defaultvalue=
|unit=m2/day or m/day
|unit=m
}}</onlyinclude>}}
}}</onlyinclude>}}


{{article end
{{article end
|notes=* Whether or not this prequel should be interpreted as ground conductivity with or without thickness, is configured using the model attribute [[Hydraulic conductivity with thickness (Water Overlay)]].
|notes=* Whether or not this prequel should be interpreted as ground conductivity with or without thickness, is configured using the model attribute [[Hydraulic conductivity with thickness (Water Overlay)]].
* The unit used also depends on whether the prequel represents ground conductivity with or ground conductivity without thickness.
|seealso=
* [[Hydraulic conductivity with thickness (Water Overlay)]]
* [[Terrain hydraulic conductivity md (Water Overlay)]]
* [[Terrain hydraulic conductivity with thickness md (Water Overlay)]]
}}
}}


{{WaterOverlay simulation data nav}}
{{WaterOverlay simulation data nav}}

Latest revision as of 13:36, 25 January 2024


Notes

  • Whether or not this prequel should be interpreted as ground conductivity with or without thickness, is configured using the model attribute Hydraulic conductivity with thickness (Water Overlay).
  • The unit used also depends on whether the prequel represents ground conductivity with or ground conductivity without thickness.

See also