Sewer pump speed (Water Overlay): Difference between revisions

From Tygron Preview Support Wiki
Jump to navigation Jump to search
No edit summary
No edit summary
 
(10 intermediate revisions by 3 users not shown)
Line 1: Line 1:
{{Overlay attribute
{{Overlay keys|<onlyinclude>
|attribute=[[Sewer_pump_speed_(Water_Overlay)|SEWER_PUMP_SPEED]]
{{Overlay keys|type=row|group=Water Overlay
|key=SEWER_PUMP_SPEED
|unit=m<sup>3</sup>/s
|unit=m<sup>3</sup>/s
|description=The amount of water per second, removed from the sewer by pumping it to an external area outside the project. It cannot be pumped back once it is in the external area.
|description=The amount of water removed from the sewer per second, by pumping it to an external area outside the project.
|defaultvalue=0
|defaultvalue=0
|icon=[[File:waterwizard_icon_sewer_pump_speed.png]]
|icon=waterwizard_icon_sewer_pump_speed.png
}}</onlyinclude>}}
 
This attribute can be defined as [[time sequence (Water Overlay)|values over time]], using an array of values defining {{time sequence start}}. This allows users to more dynamically define how fast water is removed from the model.
 
{{article end
|notes=
* Water pumped out of a sewer cannot be pumped back once it is in the external area.
* The sewer pump speed may never be negative, as this would conceptually result in water being pumped into the sewer from outside the project area.
* When using a dynamic SEWER_PUMP_SPEED, a maximum of {{array max|pairs}} can be defined.
|seealso=
* [[Sewer model (Water Overlay)]]
}}
}}
{{WaterOverlay hydrological features nav}}
{{WaterOverlay hydrological features nav}}

Latest revision as of 11:27, 2 October 2020

This attribute can be defined as values over time, using an array of values defining start-time. This allows users to more dynamically define how fast water is removed from the model.

Notes

  • Water pumped out of a sewer cannot be pumped back once it is in the external area.
  • The sewer pump speed may never be negative, as this would conceptually result in water being pumped into the sewer from outside the project area.
  • When using a dynamic SEWER_PUMP_SPEED, a maximum of 10.000 values (5.000 pairs) can be defined.

See also