Settlement result type (Subsidence Overlay)
Jump to navigation
Jump to search
Icon | Result type | Unit | Mode | Description |
---|---|---|---|---|
SETTLEMENT | m | Total | The amount that the ground has lowered as a result of compaction. |
Notes
The result is the difference between the initial terrain height (including the effects of Actions taken during a session which may change the height of the terrain), and the terrain height after the configured amount of years of subsidence.
See also