Scenario: Difference between revisions

From Tygron Preview Support Wiki
Jump to navigation Jump to search
No edit summary
 
(34 intermediate revisions by 4 users not shown)
Line 1: Line 1:
{{being updated}}
[[File:Api_multi_scenario.png|thumb|right|400px|[[Stakeholder]]s and [[Scenario]]s]]
By default, a project in the {{software}} always consists of at least one scenario.
By default, a project in the {{software}} always consists of at least one scenario.


==Adding and removing Scenarios in a project==
When you have multiple Scenarios, for example with two different designs for you project, you can switch between them from the ribbon bar in the editor. Currently, only one scenario can be active at the same time. Actions taken in a different scenario are reverted.
{{Editor location|scenarios}}
===Adding a Scenario===
A scenario can be added in two ways in the {{software}}; through a ribbon drop down option or by selecting the Add button on the bottom of the [[Left Panel|left panel]], after selecting Levels in the ribbon bar.
{{Editor steps|title=add scenario to a project|Select Multi-Scenario → Scenarios|Select Add new Scenario from the drop down menu|Or select Add on the bottom of the scenario panel}}
<br clear=all>


===Removing a Scenario from a project===
Sometimes an earlier implemented scenario becomes redundant, or an error has occurred that renders a scenario useless. In such cases it is possible to remove the scenario completely.
{{Editor steps|title=remove scenario in a project|Select Multi-Scenario &#8594; Scenarios|Select the scenario to be removed on the left panel|Select Remove on the bottom of the left panel}}
<br clear=all>


==Changing the properties of a Scenario==
{{article end
{{Editor location|Scenario}}
|notes=
===Scenario===
* Scenarios are intended to become parallel planned situations
By selecting a scenario entry on the left panel, the following properties become available on the right panel:
* Scenarios replaced the incremental ''Level'' system.
[[File:ScenarioLeftpanel.png|frame|left|Scenarios ([[Left Panel|left panel]])]]
|howtos=
====Name====
* [[How to add or remove a Scenario]]
: ''Main article: [[Names]]''
* [[How to change properties of a Scenario]]
[[File:LevelsName-Q3-2015.jpg|frame|right|Enter the level name here ([[Right Panel|right panel]])]]
* [[How to change Events fired by a Scenario]]
: In the Name field a more suitable name can be entered, if desired. Examples of this can be: "Tutorial", "Prologue", etc.
* [[How to change Measures activated by a Scenario]]
{{Editor steps|title=change the name of a level|Select Storyline &#8594; Levels|Select Level to be renamed from the left panel|Select Name field on right panel|Delete the previous name|Enter new name|Confirm by pressing the 'Enter' key}}
* [[How to configure the available actions of a stakeholder per scenario]]
<br clear=right>
* [[How to configure an intro Cinematic for a Stakeholder and a Scenario]]
|videos=
  {{video|link=https://www.youtube.com/watch?v=2eAsisgZNuo&list=PLqkv7u9AhhfwrmXQSwDkEvBbzfK900yg3&index=10|language=dutch|description=Webinar {{software}} LTS release 2023: working with scenario's.}}
}}


====Description====
{{Editor multi scenario nav}}
[[File:LevelsDescription-Q3-2015.jpg|frame|right|Describe the level ([[Right Panel|right panel]])]]
: The description field allows for describing the level in the Editor. This is convenient when the level has added complexity.
{{Editor steps|title=change the description of a level|Select Storyline &#8594; Levels|Select Level to have description added from the left panel|Select Description field on right panel|Delete the previous text (if needed)|Enter new description|Text is instantly confirmed when typed ('Enter' key adds hard return to text)}}
<br clear=right>
 
===Event Bundles===
[[File:ScenariosEventBundles-Q3-2015.jpg|frame|right|Add events to a scenario ([[Right Panel|right panel]])]]
[[File:ServerEventButtons-Q3-2015.jpg|frame|right|Add & Remove Event buttons ([[Right Panel|right panel]])]]
: ''Main article: [[Events]]''
An event is something that occurs, on which the application can react. By selecting the Event Bundles option of a scenario, (a bundle of) Server events can be added to a scenario, that will trigger as soon as the scenario is activated.
====Server Events fired when chosen====
: This section manages Server Events that are fired when the scenario is activated. Events can be assigned on the right panel to the selected scenario, after being added with the 'Add Event' button on the bottom of the [[Right Panel|right panel]]. Then the desired event can be selected from a list on the [[Bottom Panel|bottom panel]]. The selection can be confirmed with the 'Commit' button, or cancelled with the 'Cancel' button.
{{Editor steps|title=add events to a scenario|Select Multi-Scenario &#8594; Scenarios|Select scenario to have events added to|Select Event Bundles from the selected scenario|Select 'Add event' on the bottom of the right panel|Select the newly added event on the right panel|Select the desired server event from the bottom  panel|Confirm the selection with the 'Commit' button, or use the 'Cancel' button to clear the selection}}
[[File:LevelsEventsBottomPanel-Q3-2015.jpg|frame|center|Event bundle [[Bottom Panel|bottom panel]] with 'Commit' and 'Cancel' buttons]]
<br clear=all>
 
===Measures===
: ''Main article: [[Measures]]''
[[File:LevelsMeasures-Q3-2015.jpg|frame|right|Assign measures ([[Right Panel|right panel]])]]
Besides events it is also possible to trigger measures (= predefined [[actions]]) when a scenario is activated. For example; in one scenario the stakeholders looked into different spatial alignments of possible solutions, in another scenario, a particular measure is applied, decreasing the space of possible solutions, which in turn can accommodate further discussions. Prerequisite for this is to have the measure(s) already available, then select the Measures entry on the left panel. The available measures will then show up on the right panel, which can then be assigned to the selected scenario.
{{Editor steps|title=add measures to a scenario|Ensure predefined measures are available in the project|Select Multi-Scenario &#8594; Scenarios|Select the scenario to have measures added to|Select on the left panel the Measures property from the selected scenario|Mark the check box of the desired measure from the available entries on the right panel}}
<br clear=right>
 
===Stakeholders===
[[File:ScenariosStakeholderProperties.png|frame|right|Stakeholder properties ([[Right Panel|right panel]])]]
: ''Main article: [[Stakeholders]]''
Selecting the arrow next to 'Stakeholders' on the left panel opens up the stakeholder section, containing the names of all active stakeholders in the project. Here the stakeholder properties can be set up per level. The following properties can be adjusted:
====Start with Cinematic====
: ''Main article: [[Cinematics]]''
: To introduce a scenario with a cinematic, each stakeholder can have a tailor made cinematic triggered at the start of the scenario to inform about the intricacies of this particular scenario. These cinematics must be created first, before they are available for selection from the drop down menu on the right panel.
{{Editor steps|title=change the scenario stating cinematic a stakeholder|Ensure a proper cinematic is available|Select Storyline &#8594; Scenarios|Select the Scenario to have the stakeholder cinematic changed from|Select on the left panel the affected Stakeholder from the Stakeholder list of the selected scenario|Select on the right panel the desired cinematic from the drop down menu|Mark the check box 'Start with Cinematic' to activate the cinematic at the start of the scenario}}
 
====Active Action Menus====
: ''Main article: [[Actions]]''
: It is possible to assign more (or even different) action menus for each scenario, for each stakeholder. This is very useful when scenarios are implemented to build up complexity or restrict actions for that scenario. Available action menus are present in a list with check boxes. Checking a box adds the action menu to the selected stakeholder for that scenario.
{{Editor steps|title=change the available actions for a stakeholder in the selected scenario|Select Storyline &#8594; Scenarios|Select the scenario to have the stakeholder actions changed from|Select on the left panel the affected Stakeholder from the Stakeholder list of the selected scenario|Mark on the right panel the check boxes of the desired action menus}}
<br clear=right>
 
{{Template:Editor multi stakeholder nav}}
[[Category:Items]]
[[Category:Items]]

Latest revision as of 12:01, 21 February 2023

By default, a project in the Tygron Platform always consists of at least one scenario.

When you have multiple Scenarios, for example with two different designs for you project, you can switch between them from the ribbon bar in the editor. Currently, only one scenario can be active at the same time. Actions taken in a different scenario are reverted.


Notes

  • Scenarios are intended to become parallel planned situations
  • Scenarios replaced the incremental Level system.

How-to's

Videos

Webinar Tygron Platform LTS release 2023: working with scenario's. (In dutch)