Drainage datum (Water Overlay): Difference between revisions
Jump to navigation
Jump to search
(Created page with "{{Overlay keys|<onlyinclude> {{Overlay keys|type=row|group=Water Overlay |key=DRAINAGE_DATUM |unit={{datum}} |description=The datum height of the drainage. |defaultvalue=n/a |...") |
mNo edit summary |
||
Line 11: | Line 11: | ||
|notes= | |notes= | ||
* The drainage height should be higher than the bottom of the waterway it drains water to. | * The drainage height should be higher than the bottom of the waterway it drains water to. | ||
<!--* If no height is defined, the drainage is considered to be --> | |||
|seealso= | |seealso= | ||
|howtos= | |howtos= |
Revision as of 14:16, 29 January 2021
Icon | Key | Unit | Range | Description | Default value |
---|---|---|---|---|---|
DRAINAGE_DATUM | datum | The datum height of the drainage. | n/a |
Notes
- The drainage height should be higher than the bottom of the waterway it drains water to.