How to add an Area to a Measure
Jump to navigation
Jump to search
For some calculations, it may be necessary or prudent to include data in a Project in the form of Areas, such as as a basis for the Travel Distance Overlay. However, making Area's dynamic for Future Designs, such as having a specific Area only exist when a certain Measure has been activated, will require some specific setup.
How to activate and deactivate an Area together with a Measure:
- First make sure you have added or imported Areas that you want to (de)activate.
- In Future Design, open the list of Measures.
- Select the Measure which should (de)activate the Area(s).
- In the right panel, select the tab "Areas".
- Click on the "Add" button.
- Select the areas that you want to (de)activate. Optionally filter on name.
- Click on OK to confirm. The (de)activated areas should now be added to the measure.