Calculation Cloud: Difference between revisions
Jump to navigation
Jump to search
Created page with "The Calculation Cloud icon is located in the upper left part of the ribbon bar. Hovering over it opens the Calculation panel. Clicking on it recalculates the project, depending on the calculation state of the project. The Calculation Cloud has several states: <gallery> File:Calculation_cloud_automatic.png|Automatic Calculation File:Calculation_cloud_recalculate_required.png|Re-calculation Required File:Calculation_cloud_calculating.png|Calculating File:Calculati..." |
No edit summary |
||
| (4 intermediate revisions by the same user not shown) | |||
| Line 8: | Line 8: | ||
File:Calculation_cloud_calculated.png|No Calculation Required | File:Calculation_cloud_calculated.png|No Calculation Required | ||
</gallery> | </gallery> | ||
{{article end | |||
|notes=*To select Automatic Calculation, hover over the Calculation Cloud to access the Calculation Panel and selecting the Automatic Calculation Option. | |||
*Automatic calculation may be turned off automatically in case of long calculation times. | |||
|seealso=*[[Calculation panel]] | |||
*[[Ribbon bar]] | |||
|howtos= | |||
*[[How to delay Grid Overlay calculations]] | |||
*[[How to calculate only a part of the Project map]] | |||
*[[How to combine multiple calculations into a single result]] | |||
*[[How to use a limit map in a Scenario]] | |||
}} | |||
Latest revision as of 15:42, 12 January 2026
The Calculation Cloud icon is located in the upper left part of the ribbon bar. Hovering over it opens the Calculation panel. Clicking on it recalculates the project, depending on the calculation state of the project.
The Calculation Cloud has several states:
-
Automatic Calculation
-
Re-calculation Required
-
Calculating
-
No Calculation Required
Notes
- To select Automatic Calculation, hover over the Calculation Cloud to access the Calculation Panel and selecting the Automatic Calculation Option.
- Automatic calculation may be turned off automatically in case of long calculation times.
How-to's
- How to delay Grid Overlay calculations
- How to calculate only a part of the Project map
- How to combine multiple calculations into a single result
- How to use a limit map in a Scenario



