Traffic NO2 Overlay: Difference between revisions

From Tygron Preview Support Wiki
Jump to navigation Jump to search
No edit summary
No edit summary
Line 13: Line 13:
* Emissions per vehicle type both in motion and in traffic jam
* Emissions per vehicle type both in motion and in traffic jam
* Constants for road-based dilution factors
* Constants for road-based dilution factors
===Traffic===
Traffic intensities are based solely on the [[Construction attributes (Traffic Overlay)|Attributes of roads]] present in the [[3D World]].


==Calculation==
==Calculation==

Revision as of 13:31, 11 February 2022

Traffic NO2 Overlay

The Traffic NO2 Overlay is a Grid Overlay which computes the impact of traffic air pollution (in μg/m³ NO2) for any given location in the 3D World. The calculation takes into account the amounts- and types of traffic, and the distance from the source of emission. It also takes into account objects and terrain features which would block the travel of particles.

The Overlay only takes into account NO2 emissions from traffic. Other sources of emissions (such as air traffic of factories) are explicitly excluded.

Configuration

Main article: Model attributes (Traffic NO2 Overlay)

The Traffic NO2 Overlay has a number of options which allow it to be configured as desired. A configuration wizard is available.

The following aspects can be configured:

  • Emissions per vehicle type both in motion and in traffic jam
  • Constants for road-based dilution factors

Traffic

Traffic intensities are based solely on the Attributes of roads present in the 3D World.

Calculation

Main article: Traffic NO2 formula (Traffic NO2 Overlay)

The Traffic NO2 Overlay performs its calculations based on the Overlay's Attributes, the presence of trees, and the Attributes of roads present in the 3D World. The calculations follow the standard rekenmethode 1 (SRM 1), as described on [1].

Results

The following result types are available as output from the traffic NO2 calculations:

How-to's

References

  • The overlay calculations are based on Standard Calculation Method 1 (SRM1) as defined by the dutch government: wetten.overheid.nl