Action: Difference between revisions

From Tygron Preview Support Wiki
Jump to navigation Jump to search
mNo edit summary
 
(263 intermediate revisions by 11 users not shown)
Line 1: Line 1:
==Stakeholder Actions==
[[File:Api_future_design.png|thumb|right|400px|All available types of [[Action]]s]]


===What is an Action===


An action is an activity a Stakeholder can perform to achieve his objective. Some examples of actions would be a Housing Corporation aiming to realize social housing, or a Waterboard to realize open water. All actions are tied to specific Stakeholders, referring to the capability each stakeholder has to influence the 3D World. For example the waterboard has the capability to realize Open water, but not social housing or roads.
An action is an activity a [[stakeholder]] can perform to potentially achieve their objectives. A typical example of an action would be a housing corporation constructing social housing, or a water board realizing open water.


=== How do actions relate to Tygron Engine ===
Actions can be grouped together using [[Action Menu]]s. In the [[viewer ]]interface, Action menu that are available to a [[stakeholder]] are shown in the [[Action menu panel]] found the left part of the viewer interface. Selecting an Action Menu from the Action menu panel opens the Action panel, which provides options to plan an Action.


When a user plans an action it will influence the [[3D World]] and have a certain effect on [[Indicators]], simulating the effect the action would have in the real world. Since a player can have several actions available, those actions are organized into [[Categories]].
When a user plans an action, it changes the future situation and will often have an effect on [[overlays]] and [[indicators]]. For example, when a stakeholder plants new trees, this action will have an effect on the [[Livability (Overlay)|Livability overlay]] and consequently on the [[Livability (Indicator)|Livability indicator]].  


====Examples of Actions====
Actions taken are tied to specific stakeholders, allowing the recording of costs and incomes. As an example, the waterboard can be configured to have the capability to create waterways, but not social housing or roads. Since a stakeholder can be configured to have access to many different actions available, actions are organized using [[#Action Menus|Action menus]].


* '''Social Housing''': The Housing Corporation aims to build 300 social houses. One of the actions available would be "Social Housing". When the user realizes "Social Housing", progress is made on the [[indicator]]: [[building]].
[[Planned situation|Planned actions]] are generally not final. They can be canceled by the stakeholder that performed the action and sometimes be reverted by stakeholders that own the property. For reverting actions, see [[#Special Actions]]
* '''Build Open Water''': The Waterboard aims to realize 300m2 "Open Water". One of the Actions available would be "Open Water". When the user realizes "Open Water" he scores on the [[indicator]]: [[water storage]].


==Stakeholder Categories==
Each action is logged in the [[Action Log]], which can be used to trace back which actions have been taken during a [[session]] or [[test run]].


===What is a Category===
{{clear}}
===Types of Actions===
A lot of predefined actions are available in {{software}}. Each project can have its own set of available actions. Furthermore, not every action has to be available for each [[stakeholder]]. Since Projects created in the {{software}} have their focus primarily on urban planning, most of the available actions are construction options. These options allow stakeholders to plan constructions based on available [[functions]].


[[File:editor-categories-in-interface.jpg|frameless|200px]]
This section describes the types of actions that can be taken and what effect they will have when planned in your project.


A Category is a container to group Actions and keep them organized.
Actions that require a drawn selection:
* [[Function]]s.
: ''The most common type of action, the [[function]], can be applied to your project by drawing a selection. When applied, a [[building]] with that function will be planned in your project.''
* [[Upgrade Type|Upgrade]]s
: ''[[Buildings]] can be upgraded using [[Upgrade Types]], provided an upgrade definition exists within that Upgrade Type which applies to that building's [[function]]. Upgrades can be used to improve the building to a related function, or to change the building to a completely different function [[category]].''
* [[Levee]]s
* [[Attribute action]]s
: ''Similar to upgrades, although these actions do not change the function of a building. Instead, they set particular attribute values. These values can be set (at locked) by the creator of the action, or be configured by stakeholders applying these actions.''
* [[Special Option]]s:
: ''These are actions that have a functionality that cannot be further configured.
** [[Demolish]] and [[demolish underground]]
** [[Revert]]
** [[Raise land]] and [[Lower land]]
** [[Buy land]] and [[Sell land]]


====Examples of a Category====
Actions that open an additional panel:
* [[Finance view]]
* [[Transfer money]]


Example: The Housing Corporation has 5 different types of "Social Housing" Available. The Category available for the Housing Corporation would be "Social Housing" with the different "Actions" ("Social Housing A" - "Social Housing E") neatly organized inside this Category.
Actions that will be applied directly:
* [[Measure]]s
* [[Event bundle]]s


* Social Housing
====Impact of Actions====
**Social Housing A
Most actions have effects on buildings; planning new or demolishing or upgrading them. This will often have an effect on one or more indicators. Each action on a building has a [[Financial System#Costs|cost]] that will negatively affect the acting stakeholder's [[Budget (Indicator)|budget]].
**Social Housing B
**Social Housing C
**Social Housing D
**Social Housing E


For changing the effects of the buildings on the indicators, see [[functions]].


====Measures and Events====
[[Measures]] and [[event]]s also need to be defined before they can be added to a stakeholder's action menu. Events simply cause other things to happen during the session when they are activated. Measures may have a variety of effects.


{{article end
|howtos=
* [[How to add and remove an action menu]]
* [[How to edit an action menu]]
* [[How to add and remove actions]]
*[[How to add a Panel which can be opened from an Action Menu]]
*[[How to add an Attribute Action to your project]]
*[[How to add Financial Actions to your project]]
|seealso=
*[[Action Menu]]
*[[Action Log]]
*[[Action panel]]
*[[Planned situation]]
}}


Example: The Housing Corporation aims to build 300 social houses. One of the Actions available to him would be "Social Housing A".


Example:
 
The Housing Corporation has different types of Social Housing available
{{Editor future design nav}}
The Waterboard has the ability to build Open Water
[[Category:Action]]

Latest revision as of 09:07, 18 December 2023

All available types of Actions


An action is an activity a stakeholder can perform to potentially achieve their objectives. A typical example of an action would be a housing corporation constructing social housing, or a water board realizing open water.

Actions can be grouped together using Action Menus. In the viewer interface, Action menu that are available to a stakeholder are shown in the Action menu panel found the left part of the viewer interface. Selecting an Action Menu from the Action menu panel opens the Action panel, which provides options to plan an Action.

When a user plans an action, it changes the future situation and will often have an effect on overlays and indicators. For example, when a stakeholder plants new trees, this action will have an effect on the Livability overlay and consequently on the Livability indicator.

Actions taken are tied to specific stakeholders, allowing the recording of costs and incomes. As an example, the waterboard can be configured to have the capability to create waterways, but not social housing or roads. Since a stakeholder can be configured to have access to many different actions available, actions are organized using Action menus.

Planned actions are generally not final. They can be canceled by the stakeholder that performed the action and sometimes be reverted by stakeholders that own the property. For reverting actions, see #Special Actions

Each action is logged in the Action Log, which can be used to trace back which actions have been taken during a session or test run.

Types of Actions

A lot of predefined actions are available in Tygron Platform. Each project can have its own set of available actions. Furthermore, not every action has to be available for each stakeholder. Since Projects created in the Tygron Platform have their focus primarily on urban planning, most of the available actions are construction options. These options allow stakeholders to plan constructions based on available functions.

This section describes the types of actions that can be taken and what effect they will have when planned in your project.

Actions that require a drawn selection:

The most common type of action, the function, can be applied to your project by drawing a selection. When applied, a building with that function will be planned in your project.
Buildings can be upgraded using Upgrade Types, provided an upgrade definition exists within that Upgrade Type which applies to that building's function. Upgrades can be used to improve the building to a related function, or to change the building to a completely different function category.
Similar to upgrades, although these actions do not change the function of a building. Instead, they set particular attribute values. These values can be set (at locked) by the creator of the action, or be configured by stakeholders applying these actions.
These are actions that have a functionality that cannot be further configured.

Actions that open an additional panel:

Actions that will be applied directly:

Impact of Actions

Most actions have effects on buildings; planning new or demolishing or upgrading them. This will often have an effect on one or more indicators. Each action on a building has a cost that will negatively affect the acting stakeholder's budget.

For changing the effects of the buildings on the indicators, see functions.

Measures and Events

Measures and events also need to be defined before they can be added to a stakeholder's action menu. Events simply cause other things to happen during the session when they are activated. Measures may have a variety of effects.